Area Road Work - KFVS12 News & Weather Cape Girardeau, Carbondale, Poplar Bluff

Area Road Work

Area Road Work

Missouri Road Work

Southbound Interstate 55 exit ramp in Pemiscot County will be closed while MoDOT crews perform concrete repairs.  This section of roadway is the southbound exit ramp (17b) to Westbound 412 at Hayti.  Weather permitting, traffic will be reduced to one lane Monday, Apr. 28 at 8:00 a.m. and will reopen Friday, May 2 at approximately 3:30 p.m.

Interstate 55 in Cape County will be reduced to one lane with a 12-foot width restriction while MoDOT crews perform concrete repairs in the northbound lane.  This section of roadway is located from Route KK to the Perry County line.  Traffic will be reduced to one lane Tuesday, Apr. 29 at 7:30 a.m. and will reopen Friday, May 2 at approximately 5:00 p.m. 

Interstate 55 in Pemiscot County will be reduced to one lane with an 18-foot width restrictions while MoDOT crews perform concrete repairs in the northbound lane.  This section of roadway will begin approximately one mile north of Route 164 (exit 8) and extend for two miles.  Weather permitting, traffic will be reduced to one lane Monday, Apr. 28 at 10:00 a.m. and will reopen Friday, May 2 at approximately 3:00 p.m.

Route 51 in Bollinger County will be reduced to one lane while Missouri Department of Transportation crews perform drainage work in the southbound lane.  This section of roadway is located from Route 72 to Route OO.  Weather permitting, the work will take place Friday, May 2 from 7:30 a.m. to 4:00 p.m.

Route DD in Madison County will be reduced to one lane with a 12-foot width restriction while Missouri Department of Transportation crews perform drainage work in the southbound lane.  This section of roadway will begin three miles south of Route M and extend to the Bollinger County line.  Weather permitting, the work will take place Thursday, May 1 from 7:30 a.m. to 4:00 p.m.

Route 72 in Madison County will be reduced to one lane with a 12 foot width restriction while MoDOT crews perform a pipe replacement beneath the roadway.  This section of roadway is located from Pacific Street to Spruce Street.  Weather permitting, the work will take place Wednesday, Apr. 30 thru Friday, May 2 from 7:30 a.m. to 4:00 p.m. daily.

Route 51 in Butler County will be closed while MoDOT crews replace a drainage pipe beneath the roadway.  This section of roadway is located from Route 53 to County Road 655.  Weather permitting, the work will take place today, Apr. 30 from 9:00 a.m. to 2:30 p.m.

Route CC in Butler County will be reduced to one lane while MoDOT crews patch the roadway.  This section of roadway is located between Route 51 and Route FF.  Weather permitting, traffic will be reduced to one lane Wednesday, Apr. 30 from 7:30 a.m. to 4:00 p.m.

Drivers on Route 67 in Wayne and Madison Counties will experience some lane reductions as work gets underway resurfacing and installing guardrail.  Traffic will be reduced to one lane at various times from Cherokee Pass in Madison County to Butler County.  Work is expected to start on the northern portion first.  The lane closures will be in place from 7 a.m. to 7 p.m. with the project expected to wrap up late this summer.

Route B in Bollinger County will be reduced to one lane while MoDOT crews remove brush along the roadway.  This section of roadway is located from Route UU to Route 34.  Weather permitting, the work will take place Tuesday, Apr. 29 thru Thursday, May 1 from 8:30 a.m. to 3:00 p.m. daily.

Route 25 in Dunklin County will be reduced to one lane while Missouri Department of Transportation crews perform pavement repairs.  Weather permitting, Route 25 will be reduced to one lane from Route E to Route 412 Tuesday, April 29 thru Friday, May 2 from 6:30 a.m. to 5:00 p.m. daily. Route 25 will also be reduced to one lane from Route EE to Route E Wednesday, April 30 thru Friday, May 2 from 6:30 a.m. to 5:00 p.m. daily.

The southbound Bloomsdale rest area in Ste. Genevieve County will be closed while MoDOT crews perform repairs to the water lines.  Weather permitting, the rest area will close Wednesday, Apr. 30 at 8:00 a.m. and remain closed until further notice.

Interstate 57 in Scott and Mississippi Counties will continue to be reduced to one lane while MoDOT crews perform concrete repairs in the northbound lane.  This section of roadway is located from Interstate 55 to Route B at Bertrand.  Traffic will continue to be reduced to one lane throug Tuesday, May 6 and will reopen at approximately 5:00 p.m.

Westbound Route 60 in Scott and New Madrid Counties will continue to be reduced to one lane with a 16-foot width restriction while MoDOT crews perform concrete repairs.  This section of roadway is located from Interstate 55 to Route 61.  Traffic will continue to be reduced to one lane and will reopen at approximately 5:00 p.m. on Tuesday, May 6.

Route B in Cape Girardeau County will be closed while MoDOT crews replace a drainage pipe beneath the roadway.  The repairs will be made eight-tenths of a mile north of Route 72 between County Roads 462 and 469.  Weather permitting, the work will take place Wednesday, Apr. 30 from 8:30 a.m. to 3:00 p.m.

Route W in St. Francois County will be reduced to one lane while MoDOT crews trim trees next to the roadway in the eastbound and westbound lanes.  This section of roadway is located from Black Knight Drive to Clay Street in Farmington.  Weather permitting, the work will take place Wednesday, Apr. 30 from 8:00 a.m. to 4:00 p.m.

Route 61 in Cape Girardeau County will be reduced to one lane with a 12-foot width restriction while MoDOT crews performs shoulder repairs in the northbound and southbound lanes.  This section of roadway is located from the I-55/US61 Ramp to the city limits of Jackson.  Weather permitting, traffic will be reduced to one lane Wednesday, Apr. 30 and Thursday, May 1 from 7:30 a.m. to 4:00 p.m. daily.

Powered by Frankly