Multi-use path on Eggners Ferry Bridge expected to open early 20 - KFVS12 News & Weather Cape Girardeau, Carbondale, Poplar Bluff

Multi-use path on Eggners Ferry Bridge expected to open early 2017

(Source: KYTC) (Source: KYTC)
KENTUCKY (KFVS) -

Work is progressing nicely on the US 68/KY 80 Lake Barkley Bridge at Canton, and a multi-use path on Eggners Ferry Bridge is expected to be ready to open by New Year's weekend.

The contractor has completed assembly of the arch and is moving head with placement of girders for the east approach spans.

The contractor tentatively plans to move the arch into place on the main piers sometime in early to mid- February. Like placement of the arch on Eggners Ferry Bridge, setting of the main span will be highly weather dependent. A more specific date for that move will be announced as the work schedule firms up.

PCL Constructors celebrated the assembly of the arch for the New Lake Barkley Bridge by appropriately placing a Christmas tree at the top of the structure for the holidays.

The basket handle arch main span will match the main arch of the nearby Eggners Ferry Bridge over Kentucky Lake at Aurora.

The contractor has been awaiting arrival of some handrail to get the trail is ready for travel. The Transportation Cabinet plans to hold a joint formal opening ceremony for the trial sometime in the spring with state and local tourism organizations.

The multi-use trail across Eggners Ferry Bridge will interconnect with the Land Between The Lakes trail system and will connect with a trail that will run across the New Lake Barkley Bridge at Canton.

Download the KFVS News app: iPhone | Android

Copyright 2016 KFVS. All rights reserved.

Powered by Frankly