Drilling crew gathers info for design of new Eggners Ferry Bridg - KFVS12 News & Weather Cape Girardeau, Carbondale, Poplar Bluff

Drilling crew gathers info for design of new Eggners Ferry Bridge

(Source: Kentucky Transportation Cabinet) (Source: Kentucky Transportation Cabinet)
(Source: Kentucky Transportation Cabinet) (Source: Kentucky Transportation Cabinet)
(Source: Kentucky Transportation Cabinet) (Source: Kentucky Transportation Cabinet)
(Source: Kentucky Transportation Cabinet) (Source: Kentucky Transportation Cabinet)
(Source: Kentucky Transportation Cabinet) (Source: Kentucky Transportation Cabinet)
AURORA, KY (KFVS) -

A Kentucky Transportation Cabinet (KYTC) geotechnical drilling crew has been retrieving information to help them design a replacement for the U.S. 68/ KY 80 Eggners Ferry Bridge on Kentucky Lake.

Over the last few weeks, a drilling rig has been on site to gather needed information about the surrounding area where the main supports for the bridge will be installed.

Mike McGregor, Project Development Engineer for KYTC District 1 and Project Manager for the Lake Bridges Project, says that the drilling crew is providing vital information that will aid in designing the piers for the main span of the new bridge. McGregor also says that samples of rock are being taken every few feet to check rock density which is needed to gather strength information that is critical in the design of the bridge's support system.

Darrin Beckett, a KYTC engineer who is supervising the drilling, says they have been working with the Coast Guard to accommodate river traffic. The hope is to phase the bridge construction so as to minimize shifts in river traffic in and around the construction site.

Construction on the bridge is expected to begin in early 2013 with the letting of an advance project, including widening of causeways and construction of an approach bridge, according to KYTC. Work on a replacement for the Eggners Ferry Bridge has a tentative start date of 2014 with construction on the new Lake Barkley Bridge following a year or two later. Construction on these new bridges is expected to take about four years to complete.

For more information on the Lake Bridges Project, log onto www.lakebridges.com.

Copyright 2012 KFVS. All rights reserved.

  • Heartland NewsMore>>

  • MO schools depart from No Child Left Behind, look toward new plan

    MO schools depart from No Child Left Behind, look toward new plan

    Thursday, January 18 2018 9:17 PM EST2018-01-19 02:17:08 GMT
    No Child Left Behind was replaced in December (Source: KFVS)No Child Left Behind was replaced in December (Source: KFVS)

    No Child Left Behind was replaced in December 2015 with the Every Student Succeeds Act, and educational leaders in southeast Missouri are optimistic about transitioning to the new law in Fall 2018.

    No Child Left Behind was replaced in December 2015 with the Every Student Succeeds Act, and educational leaders in southeast Missouri are optimistic about transitioning to the new law in Fall 2018.

  • Structure fire in Cape Girardeau County, MO

    Structure fire in Cape Girardeau County, MO

    Thursday, January 18 2018 9:02 PM EST2018-01-19 02:02:06 GMT
    (Source: viewer submitted)(Source: viewer submitted)

    Whitewater Fire Department is fighting a structure fire off of Hwy. U and Diamond Lane in Cape Girardeau County, Missouri. 

    Whitewater Fire Department is fighting a structure fire off of Hwy. U and Diamond Lane in Cape Girardeau County, Missouri. 

  • IL lawmaker delivers speech after returning from Korean peninsula

    IL lawmaker delivers speech after returning from Korean peninsula

    Thursday, January 18 2018 8:37 PM EST2018-01-19 01:37:40 GMT
    Sen. Tammy Duckworth (Source: Wikimedia Commons)Sen. Tammy Duckworth (Source: Wikimedia Commons)

    U.S. Senator Tammy Duckworth (D-IL) was at Georgetown University in Washington days after returning from an official trip to the Korean Peninsula. 

    U.S. Senator Tammy Duckworth (D-IL) was at Georgetown University in Washington days after returning from an official trip to the Korean Peninsula. 

Powered by Frankly